精品日产A一卡2卡三卡4卡3卡,年轻内射无码视频,在线观看精品视频网站,老女人老熟女亚洲

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1501

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://itksk.com//


99久久国产综合精品五月天| 亚洲日韩av无码一区二区三区| 精品久久久久久中文字幕| 久久午夜夜伦鲁鲁片免费无码影视| 亚洲h在线播放在线观看h| 久久久久亚洲av成人网人人网站 | 无码区a∨视频体验区30秒| 色婷婷亚洲一区二区三区| 国产v亚洲v天堂无码网站| 亚洲欧美激情精品一区二区| 国产精品无码mv在线观看| 精品人妻系列无码一区二区三区| 色悠久久久久综合欧美99| 小12萝8禁在线喷水观看| 少妇人妻偷人精品免费视频| 色多多在线观看免费视频| 蜜臀av一区二区| 亚洲av最新在线网址| 超碰国产精品久久国产精品99 | 国产a∨精品一区二区三区不卡| 绝顶高潮合集videos| 国产精品久久久久无码av| 成年免费视频黄网站在线观看 | 美女黄18以下禁止观看| 一本色道久久hezyo无码| 色综合久久中文娱乐网| 最近中文字幕mv免费高清动漫| 国产精品亚洲一区二区在线观看| 无码视频一区二区三区| 欧美三级在线播放| 日本欧美视频在线观看| 内射白浆一区二区在线观看| 最近中文字幕国语免费| 日韩av午夜在线观看| 国产精品99久久久精品无码| 97久久久久人妻精品专区| 无码人妻丰满熟妇区毛片| 日产精品卡三卡在线| 国产精品久久久久久吹潮| 亚洲国产精品无码久久九九大片| 吃奶摸下高潮60分钟免费视频|